Bucket Mold

120L Plastic Bucket Mold

Frequently Asked Questions

60L trash can mold need 800-1000T injection machine
120L trash can mold need 1600T injection machine
240L trash can mold need 2400-2800T injection machine

60L trash can mold price is about 50000-80000USD
120L trash can mold price is about 80000-120000USD
240L trash can mold price is about 150000-180000USD
The final trash can mold price is base on mould material, mould cavity, hot runner brand, and mould structure.

We suggest to use 2 or 4 point hot runner to make the trash can mold. The hot runner brand is base on your cost budgeting.

Usually it takes 60-75 days to make the trash can mold, if the structure of the mold is simple, it can be finished in 50-65 days, if the structure is complicated, it takes 70-80 days to finish.

First, find the problem of the mold, if some spare part broken, such as wear block damage, hot runner damage and so on, you can contact the manufacturer to provide the new spare parts.
If it is a crack in the mold, or some unsolvable problems such as leakage of glue, you can contact the manufacturer to do the mold rework processing, or repair in the manufacturer’s cooperation with foreign repair points, the cost can be negotiated with the manufacturer.
If there is a more serious quality problem that can not be repaired, you can contact the manufacturer to return the mold or redo a new molds.

It depend on the mould material and structure.
500000shots for P20 mould material.
800000shots for 718 mould material.
1500000shots for 2738 mould material.

First is to see the design ability of the team, need product designer and mold designer.

Second is to see the processing equipment, trash can mold is relatively large, the required CNC processing equipment stroke in more than 1.5 meters, also need a large deep hole drill to do waterway processing, if there is no such equipment, it is difficult to do this kind of mold.

Finally, you also need to see if the mold company has experience in producing such molds, such as trash can molds in the processing of various details need to pay attention to, no experience manufacturers are difficult to do a good job.

Usually the payment is 50% in advance and the remaining 50% before shipment.
Since the trash can mold is relatively large, the payment can be 40% in advance and the remaining 60% before shipment.